Vikram Singh Bajwa

Senior Engineer
Career Objective

Civil in STP , WTP & Irrigation for Agriculture Preparation of Concept drawings, Tender Drawing, GFC Drawing, As Built Drawing, Technical drawing For Various Schemes (i.e. Road Works, Water Supply, Sewerage, Storm Water Drainage and Others), 1. Preparation of GA, Structural and Civil Drawings for complete Water Supply Project. 2. Estimating BOQ of various structure in WTP and Intake. 3. Extract Co-ordinate from Google Earth for preparation of L-Section for pipe line.

Personal Information
  • Father’s Name: Hoshiar Singh
  • Date of Birth: 01/16/1981
  • Nationality:
  • Marital Status: Married
  • Height: 5.4
  • Blood Group: A+
  • Permanent Address: Gurgaon
  • Mother’s Name: Bhateri Devi
  • Religion: Hindu
  • Gender: Male
  • Weight: 65
  • Present Address: haryana
Educational Qualification

  • Education Level:
  • My Major:
  • Result/GPA:
Career Application
  • Current Job Place: out of India
  • Position: Senior Engineer
  • Experiences: 20 Years +
Professionals Information

02.Dec, 2023- Continuing

VISHVARAJ ENVIROMENT PVT.LTD

Position: Senior Engineer in Civil

Responsibility: • Preparation of GA, Structural and Civil Drawings for complete Water Supply Project. • Estimating BOQ of various structure in WTP and Intake. • Extract Co-ordinate from Google Earth for preparation of L-Section for pipe line

02.May, 2016- Dec, 2023

JWIL INFRA LTD.

Position: Engineer in Civil

Responsibility: • Preparation of GA, Structural and Civil Drawings for complete Water Supply Project. • Estimating BOQ of various structure in WTP and Intake. • Extract Co-ordinate from Google Earth for preparation of L-Section for pipe line

02.Jun, 2008- May, 2016

KY Consultants Pvt. Ltd

Position: CAD Engineer

Responsibility: 1. Preparation of Concept drawings, Tender Drawing, GFC Drawing, As Built Drawing, Technical drawing For Various Schemes (i.e. Road Works, Water Supply, Sewerage, Storm Water Drainage and Others),

Special Skills
  • Preparation of GA, Structural and Civil Drawings for complete Water Supply Project. Estimating BOQ of various structure in WTP and Intake. Extract Co-ordinate from Google Earth for preparation of L-Section for pipe line
Declaration & Authentication-

I do hereby declare that the information given above is true of my knowledge.

Yours Faithful,
Vikram Singh Bajwa